Free Member Listed Since 2004 |
|
 PT. TBEK Engineering Indonesia |
| Home |
 |
| Company Info |
 |
| Share your thoughts |
| |
- Write a review
- Recommend to your friends
|  |
| Contact Us |
 |
| Language |
| | - English - Indonesia
|
 |
| | |
|
| Company Profile |
| |
| Average User Review |
There is no review for this company - Write a review | | |
| Registration Date: |
Nov. 08, 2004 |
Last Updated: |
Jan. 11, 2008 |
|
| Company Contact |
| Name: |
Mr. Artok Wijaya [Director/CEO/General Manager] |
| E-mail: |
Send Message |
| Phone Number: |
+6281315125050 |
| Address: |
Jl. Prambanan - Piyungan Km. 5, Sleman Yogyakarta 55572, Yogyakarta Indonesia |
|
| Business Nature: |
Trade, Service of Mineral, Metals & Materials category
|
|
| Company Brief |
Consultant, supply, and services for mining, geotechnical, geology, petroleum, civil engineering & constructions, and general trading
|
|
| Major Products / Services |
Buyer:
- Steam (Non Coking) Coal & Metal Mineral
We would like to purchase the Steam (Non Coking) Coal product wih the GCV range of 5, 200 - 6, 800 kCal/ kg ADB.
Supply quantity is 8, 000 - 60, 000 MT/ mth, either FOB Barge or FOB mother vessel.
Payment by Irrevocable L/ C at sight from prime banks.
Other coal specification must comply to the following:
1. TM max. 20% (ARB)
2. Sulphur max. 1% (ADB)
3. Ash max. 10% (ADB)
We also require the metal mineral as follow:
1. Bauxite ore (Al2O3 min. 48%, SiO2 max. 12%, Fe2O3 max. 10%).
2. Manganese ore (Mn min. 45%).
3. Iron ore (Fe min. 58%).
4. Iron sand (Fe min. 50%).
5. Antimonite (stibnite), as per seller offering.
6. Zircon sand, as per seller offering.
Official offering letter is addressed to:
Mr. I Gede Artha Wijaya
Director of PT. Manggala Usaha Manunggal
Graha BIP, 5th floor, Jl. Jend. Gatot Subroto Kav. 23, Jakarta 12930
Tel.: +62.21.5258211
Fax.: +62.21.5258233
The offering letter must be attached with the following documents:
1. Guarantee letter of supply quantity per month.
2. SGS/ CoA report for last 2 shipments.
3. Bill of Lading for last 2 shipments relates to the SGS/ CoA report as mentioned above.
4. Copy of Exploration Permit, Exploitation Permit, and Permit of Transportation & Selling.
5. Company Profile.
6. Other support documents.
Best Regards,
Artok Wijaya
E-mail: artokw@yahoo.com
Mobile: +6281315125050, +628197573322
| Seller:
- Steam Coal GCV 6, 000-6, 200 kCal/ kg ADB
1. Commodity: Steam (Non Coking) Coal GCV 6, 000-6, 200 kCal/ kg ADB, Crushed (50 mmmax).
2. Origin: Samboja, East Kalimantan, Indonesia.
3. Distance from mine to loading port is approx. 25 km.
4. Loading port: Pondok Gong (300 ft barge).
5. Loading rate to barge: 3, 000 MT PWWDSHINC.
6. Transhipment from loading port to mother vessel anchorage point is approx. 5 hours.
7. Opensea Anchorage: North of Teluk Balikpapan, East Kalimantan, Indonesia.
8. First shipment will be commenced by April 2008.
9. Qty supply is 16, 000 MT/ mth during May - July 2008. August 2008 and so on is min. 40, 000 MT/ mth.
10. Price is US$ 48/ MT FOB Barge.
11. Payment: Irrevocable & Transferable L/ C at sight from prime banks.
12. Area noticed in KP Exploration is 427 hectares.
13. Area noticed in KP Exploitation is 178 hectares.
14. Mineable reserve is approx. 3 million MT (SR max = 8) in area of 178 hectares.
15. Coal specification (Sucofindo report No. 0022266):
15.01. TM (ARB) 20% max.
15.02. IM (ADB) 10%.
15.03. Ash (ADB) 5%.
15.04. VM (ADB) 43%.
15.05. FC (ADB) 44%.
15.06. Tot. Sulphur (ADB) 2% max.
15.07. GCV (ADB) ROM 6, 380 kCal/ kg.
15.08. GCV (AR) ROM 5, 500 kCal/ kg.
15.09. HGI is 55 averagely.
Best Regards,
Artok Wijaya
E-mail: artokw@yahoo.com
Mobile: +6281315125050, +628197573322
- Steam Coal GCV 6, 300-6, 500 kCal/ kg ADB
1. Commodity: Steam (Non Coking) Coal GCV 6, 300-6, 500 kCal/ kg ADB, Crushed (50 mm max).
2. Origin: Bengkulu, South-west Sumatera, Indonesia.
3. Distance from mine to loading port is approx. 60 km.
4. Loading port: Pulau Baai, Bengkulu, Indonesia (300 ft barge).
5. Loading rate to barge: 3, 000 MT PWWDSHINC.
6. Transhipment from loading port to mother vessel anchorage point is approx. 3 hours.
7. Opensea Anchorage: Pulau Tikus, Bengkulu, Indonesia.
8. First shipment will be commenced by April 2008.
9. Qty supply is 8, 000 MT/ mth during April - May 2008. June - July 2008 is 16, 000 MT/ mth. August 2008 so on is min. 24, 000 MT/ mth.
10. Price is US$ 65/ MT FOB Barge.
11. Payment: Irrevocable & Transferable L/ C at sight from prime banks.
12. Area noticed in KP Exploration is 2, 600 hectares.
13. Area noticed in KP Exploitation is 199 hectares.
14. Mineable reserve is approx. 600, 000 MT (SR max = 8) in area of 100 hectares.
15. Coal specification (Sucofindo report No. 0010107):
15.01. TM (ARB) 10% max.
15.02. IM (ADB) 6%.
15.03. Ash (ADB) 7.5%.
15.04. VM (ADB) 8.37 - 37%.
15.05. FC (ADB) 51.74 - 86%.
15.06. Tot. Sulphur (ADB) 0.6% (1% max.)
15.07. GCV (ADB) ROM 6, 500 - 7, 900 kCal/ kg.
15.08. HGI is 30 - 70.
Best Regards,
Artok Wijaya
E-mail: artokw@yahoo.com
Mobile: +6281315125050, +628197573322
|
|
| | Want to contact this company?
Your inquiry will be recorded in "Member Trade Mail".
|
|
|